               Installed 2.0 MW Grid Tied Solar Power Generation
 As part of business diversification strategy,   System at Hosiery Plant 4 & Spinning, IIP; a
 established Interloop Dairies Limited  renewable energy venture focused at reducing
               around 1,500 tons of Carbon Emissions annually                                2019
 2014                                                                               Held the largest private sector IPO in
                                                                                   Pakistan’s history and listed at Pakistan
 Inaugurated Interloop Spinning Unit - II at IIP,                                Stock Exchange (PSX) as the Largest Textile
 Faisalabad comprising 26,304 spindles                                               Company by Market Capitalization

                            2019
                   Established Interloop Denim Apparel
 2017            manufacturing plant at Lahore, designed
                as per LEED Platinum Standards. The Plant
 Expanded Hosiery Manufacturing footprint to
 Sri Lanka through affiliation with Texlan Center   commenced operations in Dec 2019 with
 (Pvt.) Ltd. with current monthly production   current production capacity of 500,000 pcs per
 capacity of 3.10  million pairs of socks  month and planned capacity of 1 million pcs per
                          month by 2021







 2014                                                                  2019

 Set-up a dedicated Vertical Sampling                 Established Hosiery Plant 5 pilot project at Faisalabad, with
 Facility at IIP, Faisalabad                            current monthly production capacity of 2.5 million pairs




















 2017                                                                                        2018

 Set-up a dedicated Tights &                                                       Interloop Limited was demerged in order
 Leggings Production Unit at Plant 1,                                               to separate non-textile business into a
 Faisalabad with monthly production                                                separate Holding company & Interloop
 capacity of 0.45 million pieces  2017  2017  2018         2018                    Limited looking after the textile business,
                                                                                         with approval of LHC
 Constructed the New Distribution   15.4 MW Interloop Power Plant based   Commissioned Region’s First LEED Gold   Established IL Apparel (Pvt.) Limited; a
 Center at IIP, Faisalabad with   on Tri-Fuel Engines was setup at   Certified Socks manufacturing facility   subsidiary of Interloop Limited, looking after
 storage capacity of around 26.4   IIP, Faisalabad to cater to energy   (Plant 4) at IIP, Faisalabad with current monthly   the Knitwear Apparel business
 million pairs of socks  requirements of existing facilities and   production capacity of 7.5 million pairs of sock
 new extensions